AI & HPC

Energized sites for AI and HPC, in months instead of years.

Secured gas and land, behind-the-meter power ready to deploy, and the team that has run compute in the field for five years.
350+ MW contracted
1+ GW pipeline
5+ years operating behind the meter
Designed for 99.9%+ uptime
Sites in hand

Power on your timeline, not the utility's.

Most AI projects stall waiting on power. Ours start with it: gas and land off the grid and out of the interconnect queue, ready to energize at the scale AI actually needs.

350+ MW
Contracted gas and land
1+ GW
Development pipeline
Sites at any scale

From 10 MW deployments to 100+ MW campuses, fed by major midstream systems with no decline curve underneath.

No interconnect queue

Fully behind the meter. No utility study, no queue position, no waiting on a substation.

No curtailment obligation

Texas SB 6 large-load provisions do not reach off-grid load.

100+ Gbps fiber

Connectivity sized for AI workloads, not retrofitted after the fact.

The grid has a years-long queue. Our sites don't have one.
Our edge

Five years of behind-the-meter compute. Now pointed at AI.

Nobody else has run behind-the-meter compute in the field this long. The playbook we built running our own fleet is the foundation of every AI deployment.

Gas, from the source

We came out of oil and gas. We know the midstream systems, the contracts and the people who control the molecules.

Power, behind the meter

Generation deployed, commissioned and run by our own crews across Texas, Wyoming and Colorado, around the clock.

Compute, in harsh places

Heat, dust, remote pads and thin connectivity. Five years of keeping machines online where data centers were never meant to go.

Built for AI: tighter uptime targets, denser cooling and fiber to match. Same playbook, held to a higher standard.
The model

You own the infrastructure. We deliver everything around it.

We are not a capital partner. We are the team you bring in to make behind-the-meter work.

You own

The data center, the servers and the generation. You hold title, set the hardware roadmap and keep the upside.

We deliver

Gas under contract, land, behind-the-meter power, deployment, commissioning and 24/7 operations with our own crews.

Two industries have already proven this playbook. AI is the third.
Site specifications

What every site brings.

Site scale
10 MW to 100+ MW single sites
Generation
Behind-the-meter natural gas generation on pipeline-spec gas, sized to your load.
Time to power
Months, not years
Grid interconnection
None. Fully behind the meter.
Curtailment obligation
None. Texas SB 6 large-load provisions do not reach off-grid load.
Connectivity
100+ Gbps fiber
Uptime
Designed for 99.9%+
Location
West Texas today. Wherever the gas is next.
Operations
24/7 monitoring and field operations by our own crews

Tell us how much power you need, and when.

Megawatts and a target date are enough to start. We'll show you which sites fit and how fast they can be energized.